Day 9 of HWH
Check the connection with the remote to make it moveable.
Day 8/10 of WHW
Wiring everything
Day 7/10 of HWH
The escs for the motors were unable to be connected, so changed the connection type.
Day 6/10 of HWH
Received the pinion centering piece and I am ready to make the motors and wheels work.
Day 5/10 of HWH
Testing the motors, but noticed that the gear is off centered so I will buy a motor shaft centering piece. This should center the gear and spin the wheels of the RC.
Day 4/10 of HWH
Mounted the caterpillars onto the frames, as well with the motor.
Day 4/10 of HWH
Printed the wheels needed to spin the track .as well with the body of the RC model
3/10 of WHW
Assembled both tracks. Tracks are made from 42 links each and are held together by screws and a lock nut.
Day 2/10 of HWH
Created one set of caterpillars. Each batch of caterpillars (24) takes around 18 hours to print. I also got all the parts required to move the RC
Day 1 oh WHW
Made the caterpillars for my allterain rc vehicle. Treads are all 3d printed from PLA
Printed the all terrain vehicle caterpillars and assembled them with screws. (for winter wonderland project)